Monday, 15 December 2014

Antons final week




Final week 
in our final week we didn't do our padlet on the final week so we did a little bit of talking and then we went right on to mine craft and started building. i went into the world and right away started building balconies. then i went onto building some decorations in the rooms. then i went down to the aquarium and thought it would take forever so i said on chat, jamie can you help me. so jamie came over and came down to the aquarium and we worked on make the glass to surround water. jamie made some awsome lights that went well with the aquarium to make it look dark but still being able to see.

Monday, 1 December 2014

Anton's minecraft week 6 blog





Week 6
This week we went right into our padlets and got working on our goals then we went on minecraft and started building. i went in and helped the hospital with there elevator but it did not work so i broke it and went back to the hotel. and i saw a big sign saying paradise hotel. while i was away myles worked on the sign and i came back and it was amazing!. i helped with the underground room by digging out all the dirt from the uderground spot





Tuesday, 25 November 2014

Anton's Week 5 mine craft blog





Week 5
in week 5 we talked about who is going to have what armour for horses and decided that farms going to have iron police is going to have diamond and everybody else will have gold. Then we got onto the computer and we logged into pad let and we write our goals and then got right into our mine craft building. me and Myles started off building some windows for the hotel and Hayley worked on the juice bar. It took me about an hour to finish all the windows. and after I finished the windows I went onto the outdoor area.






Monday, 17 November 2014

Anton's Mine craft Blog week 4

Week 4
At morning tea we walked down to the south library and we walked in the computer room and reviewed on our treaty. then we went onto our padlet goals and choose one. We heard that someone hacked the world and placed water all over our world. they also broke my ELEVATOR so I had to break it and rebuild it for the 3rd time.Now it works even better than before.

We worked on the 1st story and and when we were done we headed on and made the walls for the second story. I made a elevator that goes up to third story after we made the walls one high. I had trouble because to make and elevator you need to dig a 4 by 2 rectangle that goes 2 down, but on the second story there was only one block thick. So I had to make a dip in the roof off the first floor. The 3rd and the 4th are going to have the rooms and the 2nd floor might be the food court and the 1st floor is the lobby.

When we finish the hotel up to the 4th floor we are going to work on windows and the outdoor area.
in the outdoor area we have the deck and we are going to build some barbeques and we are going to have a fun pool and maybe a hot pools area. In the front of  The doors into the hotel we have a fountain that Myles made.


Anton's Mine craft Blog week 3



week 3
Just like every other week we got onto our google logins and got into our pad lets and wrote down our goals for this week then logged off and went and signed into mine craft we got straight into our buildings and i had a communicating problem with my elevator.
I asked someone for help and they came and stuffed it while I was making one for the hospital.
I came back In the hotel and I came back to see what it was going like and it was ruined so I thought I would just restart and break it all.
After I helped out with the roof and started the second story. we did not have enough time to finish the second story so we had to pack up and sit back down on the mat.

Sunday, 16 November 2014

Anton's Mine craft Blog week 2

 
 
 
 
Week 2
 we talked about the treaty and then we did our Pad lets and when we are done we went straight into Mine craft and started building.
I finished the elevator and started building the walls with my build group while Myles made a big window. Me and Brigham had a bit of a play on the elevator to see if it was still working then we headed onto the roof. Hayley started making a counter for the first floor of the hotel.
 
the whole hotel was all made out off quarts and outside the back off the hotel we started off building a outdoor area with a pool barbeques and a diving board.
I started getting frustrated because when I tested my elevator it was very glitchy

 


Sunday, 9 November 2014

Anton's Mine craft Blog week 1

week 1
  we got put into build groups for different builds. I got put in a group with Myles, Hayley and Brigham to build the hotel.

We started off by building the area off the hotel then the rest off my build group started building higher while i built the elevator